the towers secure unit

    Location: Pontypridd, South wales

    Contract Duration: 5 Months

    Type of Work: Diamond Drilling

Downs Construction were brought in to carry out all diamond drilling and wall chasing on-site. The project consisted of four separate blocks each with 400mm reinforced concrete floors. The Downs Construction team drilled holes ranging from 30 - 300mm in diameter, as well as horizontal holes in the plant room of 152mm in diameter x 1.5m in depth. The team also carried out over 1600m of wall chasing: 40mm in width x 40mm in depth in each of the four blocks.

Brickwork complted on Ludlow Road Mental Health Concrete Cutting on Ludlow Road Mental Health Wall chaseing on Ludlow Road Mental Health Core Drilling on Ludlow Road Mental Health